The Ghana Hydrological Authority has defended its request for $5 billion to effectively tackle the country’s persistent flooding issues. In 2023, the Authority received only GH¢92 million under the National Flood Control Programme, an amount considered vastly inadequate for addressing the scale of the problem.
During an interview with Ahotor News, the Authority’s director, Dr. John Kissi, stressed that the requested funds would be utilized to implement a wide array of initiatives aimed at providing a long-term solution to Ghana’s flooding challenges.
These initiatives include extensive dredging of waterways, construction of new drainage systems, upgrading existing infrastructure, and developing floodplain management strategies.
Dr. Kissi highlighted that the current funding levels only allow for piecemeal interventions, which are insufficient given the severity and frequency of flooding events across the country.
He pointed out that investing in comprehensive flood control measures is essential to safeguarding lives, protecting property, and ensuring economic stability in flood-prone areas.
The proposed $5 billion budget, he added, would enable the Ghana Hydrological Authority to carry out a holistic plan that addresses both immediate and future flood risks, ultimately reducing the vulnerability of communities and enhancing national resilience.
LISTEN TO THE AUDIO BELOW:
Story by: Osei Akoto (Teacher Kojo) #Ahotoronline.com